ExplorerRoboticsRobotics
Research PaperResearchia:202605.21078

MC-Risk: Multi-Component Risk Fields for Risk Identification and Motion Planning

Maximilian Link

Abstract

We present MC-Risk, a planner-aligned, multi-component risk field on a bird's-eye-view grid that yields early, calibrated, and class-aware risk localization. MC-Risk linearly composes three interpretable modules: (i) a motorized-agent field that fuses a black-box multimodal trajectory predictor with an analytic Gaussian-torus construction whose lateral width grows with speed/curvature and whose height attenuates with look-ahead; (ii) a VRU risk field that replaces isotropic pedestrian blobs with...

Submitted: May 21, 2026Subjects: Robotics; Robotics

Description / Details

We present MC-Risk, a planner-aligned, multi-component risk field on a bird's-eye-view grid that yields early, calibrated, and class-aware risk localization. MC-Risk linearly composes three interpretable modules: (i) a motorized-agent field that fuses a black-box multimodal trajectory predictor with an analytic Gaussian-torus construction whose lateral width grows with speed/curvature and whose height attenuates with look-ahead; (ii) a VRU risk field that replaces isotropic pedestrian blobs with a forward-biased anisotropic kernel aligned to heading and speed; and (iii) a road penalty field that exploits full HD-map topology, imposing an off-road penalty and lane-aware risk exposure for same/opposite directions. We conduct, to our knowledge, the first standardized quantitative evaluation of a risk-field formulation on RiskBench's collision subset. MC-Risk attains the best overall risk localization and the earliest hazard indication. Finally, we demonstrate a plug-and-play planning interface by using the field as an MPC cost density, enabling risk-aware trajectory generation without additional training.


Source: arXiv:2605.21406v1 - http://arxiv.org/abs/2605.21406v1 PDF: https://arxiv.org/pdf/2605.21406v1 Original Link: http://arxiv.org/abs/2605.21406v1

Please sign in to join the discussion.

No comments yet. Be the first to share your thoughts!

Access Paper
View Source PDF
Submission Info
Date:
May 21, 2026
Topic:
Robotics
Area:
Robotics
Comments:
0
Bookmark
MC-Risk: Multi-Component Risk Fields for Risk Identification and Motion Planning | Researchia